: Public <<business use case>> UseCase
Created: 21.11.2013 11:45:53
Modified: 26.11.2013 14:16:42
Project:
Advanced:
The utiliziation of flexible loads helps to prevent peaks in Distribution System that would indicate an expensive upgrade of the grid. The DSO utilizes flexible loads by a dynamic pricing concept. This means, when the load in the Distribution System is high, the energy price is also high, and when the load in the Distribution System is low, the energy price is low as well.
Object Type Connection Direction Notes
«Business Actor» DSO Actor UseCase From  
«Business Goal» Delay DS Upgrade Requirement Realization To  
«business use case» Provides Flexible Loads UseCase Dependency To